FM · BRP‑01 · Field Manual◆ Kimberlite Engine · In service
The project-controls standard

Kimberlite Engine™

One controlled set of numbers.

The firm's proprietary scheduling and program-controls system, delivered inside every controls engagement. Owners, lenders, and boards read one schedule, one cost picture, and one version of the truth from predevelopment to turnover.

§ 1 · What it delivers

One version of the truth, gate by gate.

01

One schedule

Every program track resolves in a single integrated master schedule, so owners and lenders read the same dates.

02

Six stage gates

From concept to operations, each gate is defined in writing and held to evidence before the program moves.

03

Inside the engagement

Baseline development, formal baseline lock, operator training, and monthly cycle support, delivered by the firm.

04

The outputs are yours

The method is proprietary. The schedule, the reporting, and the record it produces belong to the client.

§ 2 · Signature

Concept to operations.

Six gates, G0 concept through G5 operations. A program does not cross a gate on opinion.

A Bastion Rozelle Partners system
G0G1G2G3G4G5
§ 3 · The family

Five systems. One standard.