FM · BRP‑01 · Field Manual◆ PLAT-E CORE · In service
Land intelligence · site screening

PLAT-E CORE

Screened to the core.

Know what the land can carry. Independent site assessment for power-intensive development: the parcel, the power, the water, and the ground, reported plainly before capital is committed.

§ 1 · What it screens

A site is bought on four things.

01

The parcel

Identity resolved first: who owns it, what it is zoned for, and what records stand behind it.

02

The power

Capacity and connection: what the grid can deliver to the parcel, and when.

03

The water

Volume legally available to the site, not just volume nearby.

04

The ground

Foundation and drainage conditions that decide what can be built and at what cost.

§ 2 · Signature

Coverage on page one.

Every report states on its first page what it measured and what it could not. No estimate stands in for a fact.

A Bastion Rozelle Partners system
ParcelIdentity and zoning
PowerCapacity and connection
WaterVolume legally available
GroundFoundation and drainage
§ 3 · The family

Five systems. One standard.